Install the evaporator in close proximity to the procedure tools to attenuate the length in the piping. Link the evaporator into the compressor, condenser, and expansion valve employing refrigerant piping. (three) The relationship posture from the inlet and outlet pipes with the modular chiller installation manual really should be appropriate https://www.penmann.co.uk/penmann-delivers-permanent-glycol-chiller-solution-for-ambrosia-creamery-in-lifton/